With the construction of the new nursery school project almost over, the paint coating that grabs the eye is being applied. We hope that the month of April will not leave the doors still rocked. Children can't wait any longer to have fun in their new school. Follow the galley for the last touches of the construction. 
|  | 
| The old face dormitory awaits a new  face lift | 
|  | 
| The school block gets a right color of the eye | 
|  | 
| The color that inspires kids in the dormitory environment and attracts  kids' loving dreams
 | 
|  | 
| Back view  of the school block seen at a distance with a well securely laid out | 
|  | 
| The new dining, kitchen, store, infirmary, bathroms & toilets seen at a distance
 | 
|  | 
| Dining and infirmary(L) and Classroom Blocks (R) seen from above with the newly purchased land (green) garden.
 | 
|  | 
| Hill view of our new school | 
|  | 
| The new Kitchen  stand right in front as Safety measure rails are being constructed the dining (L) and the and Dormitory (R).
 | 
|  | 
| Separately designed bathrooms and toilets  for girls and boys are underway  to completion as
 a worker gives  the compound  a face lift for a laundry space
 | 
|  | 
| The left view of our school from above with a security wall more than half way done
 |